
















Interior & Guest Areas
• Vessel fully deep-cleaned (July 2025)
• New carpet & padding throughout (July 2025)
• New ultra-suede pillows, bedding & linens
• New LED overhead lighting throughout (replacing halogen)
• New LED power supply (all areas)
• New coffee table (lower salon)
• New LED lighting (lower galley)
• New ice maker & refrigerator (upper salon)
Exterior & Deck
• New aft deck sunshade, lounge chairs & coffee table w/ ice chest
• Teak decks sanded
• New water filter for ice maker
• New Starlink satellite system
Mechanical & Systems
• New aluminum forward wall & sub-floating wall (engine room)
• New 9–12” insulation (walls & ceiling, engine room)
• Completely new engine room ceiling
• Bright LED engine room lighting
• Bilge fully cleaned, steam-washed, & deck plates repainted
• New bilge pumps incl. 115V emergency backup
• Re-plumbed deck drains through engine room
• New 12V & 24V batteries with chargers
• New 40-gallon water heater
• New 6,000 BTU engine room air conditioner
• Temporary A/C breaker box installed (awaiting permanent)
• New 100A wall breaker & housing
• New 27kW transformer/isolator
• New A/C chillers (2 × 36,000 BTU) with controllers
• New A/C plumbing, wiring, circulating pump & seawater pumps
• New toolbox, counter & rack (starboard side engine room)
• New bilge check valves (all areas)
• New 200 CFM forward bilge exhaust fan
• Acquired MTU LOP engine controller (2.5 LOP’s in position)